Anthony Loke: 3 Minute LRT Interval & Full Operational System By June 2023
-full_normal.jpg)
In a media press conference today, YB Anthony Loke addressed a few issues pertaining to the rail services under the purview of Prasarana.
LRT Kelana Jaya line currently is serviced by 38 sets of LRT trains which results in the five minute service interval. This is due to the fact that 18 more trains are still in various stages of maintenance. He however assured the public that all 56 trains will be fully operational by the third quarter of 2023.
He further added that Prasarana has been instructed to speed up the maintenance work to have at least 48 trains running in order to achieve the targeted 3-minute interval schedule. Prasarana has also acquired 19 new trains to service the Kelana Jaya LRT route which will start delivering in August 2023.
Prasarana, according to Loke, would also carry out major maintenance work on its LRT system which includes power generators;he does on to agree that the service is still not stable with back to back disruptions. However, the management has been instructed to have in place back-up plans and SOPs in place to lessen future disruptions. This is in view of the last massive five day Kelana Jaya LRT line closure which affected commuters badly. An independent report on that is under-way and will be made public when it's available.
-full_normal.jpg)
Based on his personal spot-checks a couple of days back where facilities in the LRT and monorail stations are not up to par, Loke added that the ministry is in the stages of awarding the contract for the replacement of 16 elevators in monorail station this coming February.
Other than that, Prasarana has also ordered 192 handrail units and 22 step chain units to facilitate repair works on 46 of the 706 escalators. They have also taken into account about 600 light bulbs which require changing and 17 roof leakage to be addressed immediately.
Moving beyond that, Loke has also instructed its division in the Transport Ministry to work with other ministerial departments such as DBKL, MPSJ and others to ensure there is a proper continuity to facility maintenance, upkeep and development to achieve a more comprehensive public transport ecosystem.
-full_normal.jpg)
Loke said he had also instructed the management of the Land Division of the Transport Ministry to expand the scope of the committee for all public transport facilities in the Klang Valley for a more comprehensive public transport ecosystem.
The final matter address was with regards to the all important first and last mile transport. According to Loke, Prasarana will further look into this matter and engage other parties including the e-hailing operators in order to make public transportation more feasible to the masses. A cost implication study will be carried out by Prasarana on this matter.

Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VRN8419
SELANGOR
BST4542
JOHOR
JD6102J
PULAU PINANG
PSF3307
PERAK
APL2539
PAHANG
CFH6270
KEDAH
KGH8710
NEGERI SEMBILAN
NEL6926
KOTA KINABALU
SJT9034
KUCHING
QAB5193P
Last updated 04 Sep, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
Ten LRT KJ Line Stations Set for Upgrade – Open From 9 AM on Weekends
Ten LRT stations on the Kelana Jaya line will be upgraded, and their operation times will be affected on weekends.
28-07-2025
Rapid KL On-Demand Adds 5 New Zones — Cyberjaya & Putrajaya Included
The Rapid KL On-Demand service has been expanded to five new zones, including Cyberjaya and Putrajaya.
17-06-2025
Rapid KL Boosts Peak Hours Operations Ahead of ASEAN Summit
Rapid KL extends peak hours train frequency to support commuters during the ASEAN Summit.
21-05-2025
Cabinet Committee Set To Tackle Road Congestion and Safety in 2025
JK-MKKJR outlines major infrastructure and enforcement plans to reduce traffic issues and accidents.
14-05-2025
Platform Automatic Gate System At KL Sentral & Tun Sambathan Now Operational
Prasarana announced that PAGS are now fully operational at KL Sentral and Tun Sambanthan stations.
26-11-2024
Prasarana Updates Peak Hour Operations For Ramadan
Prasarana has announced that the peak hours for its rail and bus services will be extended throughout Ramadan.
12-03-2024
Five LRT3 Stations Set To Be Operational In 2027
Five Light Rail Transit Line 3 (LRT3) stations that were previously cancelled should be operational by 2027, says Loke.
11-01-2024
Prasarana Will Enable Credit And Debit Card Options At Rail Stations By July
Prasarana plans to enable credit and debit card payments at ticketing counters by July.
07-12-2023
Latest News
Will "Made-in-Malaysia" BYD EVs Become A Reality Soon?
Discover what Sime Motors' Shenzhen trip signals for local assembly (CKD) in Malaysia.
04-09-2026
Kids Spotted Sitting on Moving Alphard Roof in Ipoh: Police Launch Investigation Under Child Act
Ipoh police are tracking a Toyota Alphard driver after a viral video showed two kids sitting on the roof via the sunroof.
03-09-2026
"Traffic Was Slow Before The Tanker Struck": Horrific 11-Vehicle LPT1 Crash Claims 4 Lives Near Temerloh
Four people, including Kuantan’s Secangkir Cafe founders and their 4-year-old son, were killed after an out-of-control cement tanker triggered an 11-vehicle crash on LPT1 near Temerloh. Read the latest police updates.
01-09-2026
Perodua's Supplier Just Dropped A Huge RM54Mil Clue About A Secret New Model Launching In 2027
Perodua supplier MCE Holdings drops an RM54M clue about a secret 2027 model. Read about the upcoming next-gen Myvi, Bezza facelift, and local ADAS tech.
27-08-2026
Proton Almost Built A RM150,000 Mid-Engined Sports Car Using Lotus Tech & Wira Parts
Did you know Proton almost built a RM150k mid-engined sports car? Discover how 'Project Sepang' combined Lotus engineering, Wira parts, and Petronas tech.
26-08-2026
RM1,000 Trade-In Subsidy For Old Motorcycles: Transport Ministry Considers New Scheme
Got an old motor? MOT is considering a RM1,000 trade-in subsidy to help Malaysian riders upgrade to new CKD bikes. Here is how the proposed scheme works.
26-08-2026
Do You REALLY Have To Give Way To Every Siren? What Experts Say About VIP Convoys vs. Emergencies
Do you legally have to give way to VIP convoys in Malaysia? Here is what traffic laws and safety experts say about sirens, outriders, and RM10k fines.
26-08-2026
"Can I Pass My Diesel Quota To My Family?" — 3 Big Changes Coming To Malaysia’s Diesel Subsidy System
KPDN & MOF to launch 3 diesel subsidy updates in less than a month, covering family quota transfers, sambung bayar eligibility, and easier applications.
24-08-2026
Show More
trending_flat
