ENZHMS
Link Copiedcheck_circle
Auto News

RM4b Needed, Critical Road Repairs Come First

Anis

Share via

f-jln-1.jpg
Due to budget constraints, road repairs in high-risk areas nationwide will be carried out in stages, prioritising the most severely damaged sections, said Works Minister Datuk Seri Alexander Nanta Linggi.

Speaking at the Works Ministry’s Gawai Open House, he revealed that nearly RM4 billion is needed to fix all identified hazardous roads, far beyond the current available funding.
WhatsApp-Image-2022-04-28-at-8.31.45-AM.jpeg

“We already have complete data on dangerous roads and the financial requirements. To fix everything would cost RM4 billion, but we don’t have that much allocation, so we will proceed in stages,” he says in a Bernama report.

He was addressing the ministry's response following the June 9 incident that claimed 15 UPSI student lives on the East-West Highway (JRTB) between Gerik and Jeli.

This year, according to the minister, RM55 million has been allocated specifically for upgrades to the JRTB, including the installation of 385 street lights and improved road markings.
pothole_theStar-full_normal.jpg

Nanta added that the ministry is prioritising repairs based on its database, focusing first on roads in the worst condition.


“We focus on the critical ones first. Those that are damaged but not too badly will be delayed slightly,” he said, adding that road assessments follow the Pavement Condition Assessment (PCA) method using MLP and FWD technologies, with the JRTB assessment conducted from March 13 to May 13.
JALAN-GERIK.jpeg

Commenting on calls to install guardrails at high-risk areas, Nanta said the Works Ministry is open to public feedback, including suggestions shared online.

"We take into account all views, from the public, netizens and relevant stakeholders. We will evaluate every suggestion carefully,” he further added.




Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

JPJ Running Numbers

KUALA LUMPUR

VRU8709

SELANGOR

BSU5416

JOHOR

JG2045J

PULAU PINANG

PSG6453

PERAK

APM4216

PAHANG

CFJ1895

KEDAH

KGJ5443

NEGERI SEMBILAN

NEM3599

KOTA KINABALU

SJU6455

KUCHING

QAB7995P

Last updated 22 Oct, 2026

Fuel Price

Petrol

RON 95

RM 3.97

+1.38

RON 97

RM 4.90

+1.75

RON 100

RM 7.20

+2.20

VPR

RM 8.23

+2.00

Diesel

EURO 5 B10

RM 5.12

+2.08

EURO 5 B7

RM 5.32

+2.08

Last updated 30 Apr, 2026

Related News

Auto News
Budget 2026: RM13bil To Strengthen Road Infrastructure Nationwide

Budget 2026: RM13bil To Strengthen Road Infrastructure Nationwide

The government will channel RM13 billion to enhance road networks, improve safety.

12-10-2025
Auto News
Nanta: Damaged Road Surface Linked to Cyclist’s Death

Nanta: Damaged Road Surface Linked to Cyclist’s Death

Road damage blamed on heavy lorry traffic; urgent repairs ordered following fatal crash.

Auto News
AI and Drones: The Future of Road Safety?

AI and Drones: The Future of Road Safety?

AI, drones, and public feedback could soon help fix potholes before they claim more lives.

Auto News
Report: Over RM1.9 billion Spent To Maintain Pen. Malaysia Roads In 2024

Report: Over RM1.9 billion Spent To Maintain Pen. Malaysia Roads In 2024

Works Minister revealed over RM1.9 billion was spent to maintain roads in 11 states across Peninsular Malaysia in 2024.

26-02-2025
Auto News
Authorities Must Follow 24h Road Repair SOP - Works Ministry

Authorities Must Follow 24h Road Repair SOP - Works Ministry

Authorities must follow the SOP set by KKR to repair damaged federal roads within 24 hours.

27-11-2024
Auto News
Works Minister: RM4 Billion Needed To Repair Federal Roads

Works Minister: RM4 Billion Needed To Repair Federal Roads

Works Minister Datuk Seri Alexander Nanta Linggi revealed up to RM4 billion is needed to repair federal roads.

30-07-2024
Auto News
Works Minister Demands Urgent Report On Kluang Pothole Crash

Works Minister Demands Urgent Report On Kluang Pothole Crash

Works Minister demanded a swift report on the poor maintenance of Jalan Sengkang-Felda Inas-Bandar Tenggara road.

28-03-2025
Auto News
Works Minister Scheduled To Meet Concessionaire Over Fatal Johor Pothole Accident

Works Minister Scheduled To Meet Concessionaire Over Fatal Johor Pothole Accident

Works minister has scheduled an urgent meeting with concessionaire after the fatal Johor pothole accident.

26-03-2025

Latest News

Auto News
Proton's Exports Are Growing, But Not All The Cars Wear Proton Badges

Proton's Exports Are Growing, But Not All The Cars Wear Proton Badges

Proton exported 7,370 vehicles in the first nine months of 2026, including Geely cars built in Malaysia. Here's why it matters for Tanjong Malim.

21-10-2026
Auto News
6,537 Road Deaths In 2025 - Can Malaysia's New Safety Push Make A Difference?

6,537 Road Deaths In 2025 - Can Malaysia's New Safety Push Make A Difference?

Malaysia recorded 6,537 road deaths in 2025. With a new MOT-MIROS proposal underway, can the country meet its target to halve fatalities by 2030?

20-10-2026
Auto News
ECRL Vs Driving To Kota Bharu: Petrol, EV Or Train, Which Costs Less?

ECRL Vs Driving To Kota Bharu: Petrol, EV Or Train, Which Costs Less?

ECRL fares to Kota Bharu start at RM125. We compare train tickets with petrol and EV energy costs to see which option makes more sense.

19-10-2026
Auto News
"We'd Love To Go Back": Mercedes Eyes Sepang Return As F1 Night Race Idea Emerges

"We'd Love To Go Back": Mercedes Eyes Sepang Return As F1 Night Race Idea Emerges

Mercedes-AMG Petronas F1 wants to return to Sepang, while Signify says a night race is technically possible. Could Malaysia's next F1 race be after dark?

19-10-2026
Auto News
RM52,000 In Car Rebates? Sime Motors' 3-Day Sale Is Now On!

RM52,000 In Car Rebates? Sime Motors' 3-Day Sale Is Now On!

Sime Motors' 3-day sale runs from 16 to 18 October 2026 in Ara Damansara, with car rebates up to RM52,000, test drives and special offers.

16-10-2026
Auto News
RM950 Million From F1 At Sepang. So Why Is Malaysia Still Hesitating?

RM950 Million From F1 At Sepang. So Why Is Malaysia Still Hesitating?

F1 at Sepang generated nearly RM950 million in economic impact. But a five-year Malaysian GP deal could cost RM1.5 billion. Here's why.

16-10-2026
Auto News
35 Cars Daily! BYD's New Miri 3S Centre Puts Aftersales In Focus

35 Cars Daily! BYD's New Miri 3S Centre Puts Aftersales In Focus

BYD's new Miri 3S Centre can service up to 35 cars daily. Here's how the latest Sarawak expansion strengthens aftersales support for EV owners.

15-10-2026
Auto News
Chery Omoda 5 Recall: 600 Cars In 2024, 8,878 In 2026. What Changed?

Chery Omoda 5 Recall: 600 Cars In 2024, 8,878 In 2026. What Changed?

Chery's Omoda 5 recall covers 8,878 vehicles, compared with 600 in 2024. Here's what changed, what remains unknown and what owners should do.

15-10-2026

Show More

trending_flat

Malaysia First Used Car and EV Consignment Platform

This is the best place to sell your car at true market value. Instead of accepting low dealer trade-ins, we handle everything and connect your car directly to genuine buyers for the highest price.

I want to consign my car! Trade-in price too low.

CariCarz Automall

Understanding CariCarzAutomall Consignment Plan

Approved 200-Check Points Inspection

7 Day Money Back Guarantee

One Year Extended Warranty

No Hidden Charge

Carz Automedia Malaysia Logo
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2026 CariCarz.com. All Rights Reserved.