KLIA Aerotrain To Stop Nightly From Nov 15 For Reliability Upgrades

KLIA’s Aerotrain at Terminal 1 will be out of service nightly from 9PM to 7AM starting tomorrow for about a month while Malaysia Airports Holdings Bhd (MAHB) carries out a major technical upgrade.
“Our priority is to make sure the Aerotrain is safe and reliable, and this plan lets us tackle the root causes of past disruptions while keeping passengers protected,” said MAHB managing director Datuk Mohd Izani Ghani.
During the nightly suspension, buses will run between the main terminal and the satellite building, and more flights will operate from the main terminal to cut down transfers.

“We expect the work to take around a month, until Dec 15,” Izani added.
The upgrade will be carried out in three stages. The first stage focuses on inspections and fixing key faults. The second stage covers testing, software updates, and stress checks. The final stage involves trial operations to ensure everything runs smoothly before full service resumes.
Independent audits and a safety check by the Land Public Transport Agency (APAD) will provide extra assurance.

Since resuming service on July 1, the Aerotrain has carried over seven million passengers and completed more than 53,000 trips, with a 98.4% operational record.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VSA8652
SELANGOR
BSV3534
JOHOR
JH9503J
PULAU PINANG
PSH6158
PERAK
APN2791
PAHANG
CFJ4872
KEDAH
KGJ9561
NEGERI SEMBILAN
NEM6948
KOTA KINABALU
SJV3290
KUCHING
QAB1027Q
Last updated 25 Nov, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
KLIA's New Aerotrain Set To Be Operational in Q1 2025
KLIA’s new Aerotrain service is expected to be completed in January 2025.
17-07-2024
Anthony Loke: KLIA Shuttle Buses To Solve Aerotrain Operation Issues
YB Anthony Loke announced that the Kuala Lumpur International Airport (KLIA) shuttle buses between the main terminal and its satellite terminals would now operate around the clock.
09-01-2023
Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues
KLIA’s aerotrain needs a system reset to ensure long-term reliability as patch fixes alone won’t solve recurring disruptions.
17-11-2025
KLIA Aerotrain Breaks Down Again; MOT, APAD Step In
KLIA’s Aerotrain is down again and the Transport Minister has told APAD to step in and probe MAHB’s handling of the issue.
28-10-2025
KLIA Aerotrain Breaks Down Hours After Back-in-Schedule Announcement
Fresh off nearly two weeks of “fine-tuning” maintenance to boost reliability, KLIA’s aerotrain stalled at 1.36PM, service only resumed at 5.38PM.
04-09-2025
Loke Reaffirms KLIA Aerotrain’s Safety After Tunnel Flooding, Door Incident
KLIA’s new Aerotrain is running safely, says Loke, with systems responding as designed during recent disruptions.
07-07-2025
KLIA Aerotrain Stalls After Downpour Causes Drainage Pump Malfunction
Just days after its grand relaunch, KLIA Aerotrain service was briefly halted when a faulty pump let rainwater flood its tunnel.
04-07-2025
KLIA Aerotrain Begins Trial Runs, Nightly Shutdown Remains
Malaysia Airports will start trial operations for the KLIA Aerotrain as part of a month-long plan to fix reliability issues.
17-12-2025
Latest News
JPJ Requires Updated Address, Email And Phone Number Details
JPJ requires updated address, email and phone details. Here's what Malaysians need to check, how to update their information and what JPJ says about deadlines.
24-11-2026
Penang ANPR: 27,734 Parking Fines Cancelled, Future Plans Explained
Penang has no plans to resume ANPR parking enforcement after cancelling 27,734 fines and refunding RM203,170. Here's what drivers should know.
23-11-2026
Yangwang U9 And U8 To Be Displayed In Malaysia At MATRADE, Nov 27–29
The Yangwang U9 and U8 are coming to Malaysia for a special showcase at MATRADE from Nov 27–29. Here's where to see them and what makes them special.
23-11-2026
Police Roadblock Malaysia: What To Do If An Officer Asks For Money
Asked for money at a police roadblock in Malaysia? Learn how to identify unofficial payments, stay safe and report suspected police bribery.
23-11-2026
Kelantan Flood Forecast Nov 24–27: Jeli, Pasir Mas, Tanah Merah And Tumpat At Risk
Kelantan flood forecast Nov 24–27: Jeli, Pasir Mas, Tanah Merah and Tumpat at risk. Here's what drivers should check before travelling.
23-11-2026
Women Want Female E-Hailing Drivers. But Are There Enough Options In Malaysia?
Looking for female e-hailing drivers in Malaysia? Explore women-only rides, service availability, passenger safety and legal transport requirements.
18-11-2026
Malaysia Toll Abolition Explained: RM400 Billion And Highway Concessions
Why could abolishing Malaysia's highway tolls cost RM400 billion? Explore highway concessions, toll payments and alternatives to nationwide toll abolition.
17-11-2026
GWM Malaysia 2026 Year-End Deals: Prices, Warranties And Financing Offers
GWM Malaysia's 2026 year-end deals include the ORA Good Cat from RM94,000, Haval H6 HEV privileges, WEY G9 financing and Tank SUV warranties.
16-11-2026
Show More
trending_flat
Malaysia First Used Car and EV Consignment Platform
This is the best place to sell your car at true market value. Instead of accepting low dealer trade-ins, we handle everything and connect your car directly to genuine buyers for the highest price.

Understanding CariCarzAutomall Consignment Plan


Approved 200-Check Points Inspection

7 Day Money Back Guarantee

One Year Extended Warranty

No Hidden Charge