Kelana Jaya LRT trains “out of service” but line running normally - RapidRail
Rapid Rail has reassured commuters that the Kelana Jaya LRT line is running as scheduled despite recent posts about trains being “taken out of service.”
The operator says these updates are routine and part of standard operational and safety procedures, such as minor maintenance or system checks, including air-conditioning issues.
“When a train is withdrawn from service, Rapid Rail implements mitigation measures, including deploying replacement trains if necessary. This ensures that headways are maintained during peak hours and that service reliability is not affected,” the firm said.

Earlier this week, several trains were temporarily withdrawn across different stations, starting Monday at 6:38 am at Gombak, followed by Masjid Jamek, Damai, and Kelana Jaya stations. The posts sparked concerns among commuters, many of whom feared the line was facing serious technical issues.
Transport Minister Anthony Loke weighed in, saying, “I take seriously the recent service disruptions involving the Kelana Jaya LRT line at the start of Ramadan. The public has every right to expect a more efficient and reliable service.”
He has instructed Prasarana Malaysia Bhd’s CEO to provide a full explanation during a post-Cabinet meeting, along with an immediate recovery action plan. The minister also directed the Land Public Transport Agency (APAD) to investigate and take action if operational weaknesses are confirmed.
Rapid Rail emphasized that despite the temporary withdrawals, the LRT is operating according to peak-hour intervals and there has been no unusual congestion at stations or onboard trains.
"Our proactive communication aims to keep passengers informed in real time and should not be interpreted as service disruptions," The operator added.

The series of events followed multiple disruptions on Tuesday, with a morning and afternoon incident affecting commuter flows.
While the notices understandably caused frustration, the operator stressed that safety and passenger comfort are priorities, and temporary withdrawals are standard practice to ensure smooth operations.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VRN5207
SELANGOR
BST3938
JOHOR
JD4737J
PULAU PINANG
PSF2572
PERAK
APL1882
PAHANG
CFH5991
KEDAH
KGH8048
NEGERI SEMBILAN
NEL6518
KOTA KINABALU
SJT8553
KUCHING
QAB4992P
Last updated 30 Aug, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
MOT Reviewing Platform Screen Doors For LRT Following Blind Passenger’s Death
MOT is considering platform gates at Kelana Jaya and Ampang LRT stations after a fatal accident involving a blind commuter.
10-09-2025
Loke Directs Prasarana To Meet On Klang Valley Train Disruptions
Prasarana has been directed by Loke to hold a special meeting to find the source of the technical issues affecting the MRT and LRT lines.
29-03-2023
Seven Day Free Travel, Kelana Jaya LRT Line - My50, Touch 'N Go and Token Users
As announced previously, free fares will be provided for every day of service disruption to Kelana Jaya Line LRT users. Even though the Kelana Jaya LRT line was only suspended for five (5) days, users will still be given free travel for seven (7) days.
14-11-2022
Automatic Train Control System Faulty, Kelana Jaya LRT’s Service Disruption
A fault in the Automatic Train Control (ATC) system has caused a disruption for the entire Kelana Jaya line LRT service schedule.
08-11-2022
Latest News
Perodua's Supplier Just Dropped A Huge RM54Mil Clue About A Secret New Model Launching In 2027
Perodua supplier MCE Holdings drops an RM54M clue about a secret 2027 model. Read about the upcoming next-gen Myvi, Bezza facelift, and local ADAS tech.
27-08-2026
Proton Almost Built A RM150,000 Mid-Engined Sports Car Using Lotus Tech & Wira Parts
Did you know Proton almost built a RM150k mid-engined sports car? Discover how 'Project Sepang' combined Lotus engineering, Wira parts, and Petronas tech.
26-08-2026
RM1,000 Trade-In Subsidy For Old Motorcycles: Transport Ministry Considers New Scheme
Got an old motor? MOT is considering a RM1,000 trade-in subsidy to help Malaysian riders upgrade to new CKD bikes. Here is how the proposed scheme works.
26-08-2026
Do You REALLY Have To Give Way To Every Siren? What Experts Say About VIP Convoys vs. Emergencies
Do you legally have to give way to VIP convoys in Malaysia? Here is what traffic laws and safety experts say about sirens, outriders, and RM10k fines.
26-08-2026
"Can I Pass My Diesel Quota To My Family?" — 3 Big Changes Coming To Malaysia’s Diesel Subsidy System
KPDN & MOF to launch 3 diesel subsidy updates in less than a month, covering family quota transfers, sambung bayar eligibility, and easier applications.
24-08-2026
Hannah Yeoh & Amirudin Shari Unveil 5 Emergency Steps To Fix Klang Valley Floods Before Budget 2027
Hannah Yeoh & Amirudin Shari unveil a 5-step Klang Valley flood mitigation plan covering dam reviews, retention ponds, and river desilting before Budget 2027.
24-08-2026
Mat Rempit Shut Down Linkedua Highway Near JPO So They Could Race — Grown Men Aged Up To 45 Arrested
PDRM arrests 8 men aged 26 to 45 after a viral video over the weekend showed street racers shutting down the Linkedua Highway near JPO in Johor for a race.
24-08-2026
Cycle & Carriage Sells Its Malaysia & Singapore Business To Indonesian Billionaire For RM868 Million
Jardine Cycle & Carriage sells its Malaysia & Singapore car business for RM868 million to Indonesia's Chandra Asri. Here is what it means for car owners!
21-08-2026
Show More
trending_flat