Hannah Yeoh & Amirudin Shari Unveil 5 Emergency Steps To Fix Klang Valley Floods Before Budget 2027

Managing water flow across state boundaries can no longer be done in isolation. With 3 out of every 10 Malaysians residing in Selangor and Kuala Lumpur, a region driving 41.7% of the national economy, the Selangor state government and the Federal Territories Department have officially unified their flood mitigation strategy.
In a joint statement issued by Federal Territories Minister Hannah Yeoh and Selangor Menteri Besar Datuk Seri Amirudin Shari, both administrations agreed on a 5-point plan targeting land management, reservoir capacity, green spaces, sustainable urban development, and water flow.
TL;DR — The 5 Joint Flood Mitigation Actions
- Technical Taskforce: A joint technical team will meet within 2 weeks to outline project locations, scope, costs, and funding ahead of the upcoming Parliament session and Budget 2027 tabling.
- Dam Capacity Studies: Evaluation of Batu Dam and Klang Gates Dam to determine whether current retention capacity meets water management needs for the next 20 to 30 years.
- New Upstream Ponds: Technical agencies will scout suitable upstream locations, primarily in Selangor, to construct brand-new flood retention ponds.
- Existing Pond Upgrades: Selangor JPS identified 3 ponds for expansion, Kampung Laksamana, Sungai Kertas, and Bukit Lagong (which requires forest reserve degazettement).
- River Dredging & Silt Site: Synchronized desilting across KL and Selangor rivers, backed by a dedicated 30-acre sediment disposal site in Selangor identified by KL JPS.
Aligning Cross-Border Water Flow

Because water flows from Hulu Selangor through Kuala Lumpur before reaching southern zones, both leaders emphasized that drainage cannot be managed in silos. A technical meeting will convene within two weeks to outline exact costs, funding sources, and implementation timelines. Preliminary findings will be submitted prior to the upcoming Parliamentary sitting and the tabling of Budget 2027.
Read: TNB: Floods, EVs and Electrocution Fears
Long-Term Dam Studies & Retention Upgrades

Flash floods inundate Jalan Sultan Azlan Shah in 2022 following heavy rainfall. (Photo credit: Hazreen Mohamad / Harian Metro)
Beyond immediate desilting, engineers will assess whether the Batu Dam and Klang Gates Dam can withstand regional rainfall demands for the next 2 to 3 decades.
Concurrently, three existing retention ponds in Selangor, Kampung Laksamana, Sungai Kertas, and Bukit Lagong, have been slated for capacity expansion. Expanding the Bukit Lagong facility will require degazetting a portion of its surrounding forest reserve land. To support ongoing desilting works, Kuala Lumpur JPS is securing a 30-acre dedicated sediment disposal site within Selangor to manage dredged materials safely.
Written By
Sofea Najmi
A Bachelor of English Language and Literature graduate with an obsession for the finer details. Sofea uses her background in translation to decode the technicalities of automotive innovation. She is dedicated to delivering impactful, meticulously researched articles that provide a narrative far beyond the spec sheet. LinkedIn: https://bit.ly/3C018vv
JPJ Running Numbers
KUALA LUMPUR
VSA8652
SELANGOR
BSV3534
JOHOR
JH9503J
PULAU PINANG
PSH6158
PERAK
APN2791
PAHANG
CFJ4872
KEDAH
KGJ9561
NEGERI SEMBILAN
NEM6948
KOTA KINABALU
SJV3290
KUCHING
QAB1027Q
Last updated 25 Nov, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
Hannah Yeoh: Synergy Needed To Make Sepang Circuit Great Again!
Hannah will look into a few aspects that could benefit from external collaborations with other agencies for SIC to improve.
11-12-2022
Latest News
JPJ Requires Updated Address, Email And Phone Number Details
JPJ requires updated address, email and phone details. Here's what Malaysians need to check, how to update their information and what JPJ says about deadlines.
24-11-2026
Penang ANPR: 27,734 Parking Fines Cancelled, Future Plans Explained
Penang has no plans to resume ANPR parking enforcement after cancelling 27,734 fines and refunding RM203,170. Here's what drivers should know.
23-11-2026
Yangwang U9 And U8 To Be Displayed In Malaysia At MATRADE, Nov 27–29
The Yangwang U9 and U8 are coming to Malaysia for a special showcase at MATRADE from Nov 27–29. Here's where to see them and what makes them special.
23-11-2026
Police Roadblock Malaysia: What To Do If An Officer Asks For Money
Asked for money at a police roadblock in Malaysia? Learn how to identify unofficial payments, stay safe and report suspected police bribery.
23-11-2026
Kelantan Flood Forecast Nov 24–27: Jeli, Pasir Mas, Tanah Merah And Tumpat At Risk
Kelantan flood forecast Nov 24–27: Jeli, Pasir Mas, Tanah Merah and Tumpat at risk. Here's what drivers should check before travelling.
23-11-2026
Women Want Female E-Hailing Drivers. But Are There Enough Options In Malaysia?
Looking for female e-hailing drivers in Malaysia? Explore women-only rides, service availability, passenger safety and legal transport requirements.
18-11-2026
Malaysia Toll Abolition Explained: RM400 Billion And Highway Concessions
Why could abolishing Malaysia's highway tolls cost RM400 billion? Explore highway concessions, toll payments and alternatives to nationwide toll abolition.
17-11-2026
GWM Malaysia 2026 Year-End Deals: Prices, Warranties And Financing Offers
GWM Malaysia's 2026 year-end deals include the ORA Good Cat from RM94,000, Haval H6 HEV privileges, WEY G9 financing and Tank SUV warranties.
16-11-2026
Show More
trending_flat
Malaysia First Used Car and EV Consignment Platform
This is the best place to sell your car at true market value. Instead of accepting low dealer trade-ins, we handle everything and connect your car directly to genuine buyers for the highest price.

Understanding CariCarzAutomall Consignment Plan


Approved 200-Check Points Inspection

7 Day Money Back Guarantee

One Year Extended Warranty

No Hidden Charge