ENZHMS
Link Copiedcheck_circle
Auto News

ECRL Railway Construction Along Kota Bharu-Selangor Over 80% Complete

Anis

Share via

UTU_MAJLISPELANCARANREKABENTUKTRENEMUDANLOGOECRL_010.jpg
The East Coast Rail Link (ECRL) project, spanning 665 kilometers from Kota Bharu, Kelantan to Selangor, has achieved over 81% completion. Malaysia Rail Link Sdn Bhd (MRL) CEO Datuk Seri Darwis Abdul Razak confirmed the project's progress, stating it remains on track for its December 2026 completion date.
According to Darwis, the 81% completion figure follows a recent inspection of the Pasir Puteh ECRL Station site.
ECRL-alignment-2023-630x445.jpg


“The work progress of the 43-kilometre alignment in Kelantan has reached 88.86 per cent, contributing significantly to the overall advancement of the project,” he said, adding that testing and commissioning activities are expected to begin in June 2026.
The CEO of MRL stated that construction on the two ECRL stations in Pasir Puteh and Tunjong, Kelantan, are 69 and 68 percent complete, respectively. Both stations should be finished by May 2025.
kb01-15012025-ecrl_4898512_20250115212631.jpg
Furthermore, Darwis said that the 400-kilometer section connecting Kelantan, Terengganu, and portions of Pahang is doing well, with 90 percent of the work completed in Terengganu and 86 percent in Pahang.

Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

JPJ Running Numbers

KUALA LUMPUR

VSB5098

SELANGOR

BSV4475

JOHOR

JJ4597J

PULAU PINANG

PSH7347

PERAK

APN3853

PAHANG

CFJ5224

KEDAH

KGK1051

NEGERI SEMBILAN

NEM7520

KOTA KINABALU

SJV4346

KUCHING

QAB1580Q

Last updated 28 Nov, 2026

Fuel Price

Petrol

RON 95

RM 3.97

+1.38

RON 97

RM 4.90

+1.75

RON 100

RM 7.20

+2.20

VPR

RM 8.23

+2.00

Diesel

EURO 5 B10

RM 5.12

+2.08

EURO 5 B7

RM 5.32

+2.08

Last updated 30 Apr, 2026

Related News

Auto News
ECRL Vs Driving To Kota Bharu: Petrol, EV Or Train, Which Costs Less?

ECRL Vs Driving To Kota Bharu: Petrol, EV Or Train, Which Costs Less?

ECRL fares to Kota Bharu start at RM125. We compare train tickets with petrol and EV energy costs to see which option makes more sense.

19-10-2026
Auto News
Why Extending The ECRL To Rantau Panjang Could Be A Much Bigger Deal Than It Sounds

Why Extending The ECRL To Rantau Panjang Could Be A Much Bigger Deal Than It Sounds

The proposed ECRL extension to Rantau Panjang could link Malaysia with Thailand and a wider Asian rail and port network. Here's why it matters.

29-09-2026
Auto News
Kuantan Welcomes ECRL’s First Trains Ahead of 2027 Operations

Kuantan Welcomes ECRL’s First Trains Ahead of 2027 Operations

The first ECRL electric passenger trains and freight locomotives have arrived in Kuantan as the project moves closer to operations in 2027.

11-02-2026
Auto News
ECRL Fares To Be Announced Ahead of 2027 Launch

ECRL Fares To Be Announced Ahead of 2027 Launch

ECRL fares will be disclosed several months prior to the commencement of operations in January 2027, according to Transport Minister.

30-01-2026
Auto News
ECRL Launch Hinges On System Integration, Jan 2027 Target Maintained

ECRL Launch Hinges On System Integration, Jan 2027 Target Maintained

The ECRL remains on schedule, with system integration and testing now the key focus ahead of its planned Jan 2027 launch.

29-01-2026
Auto News
ECRL First EMU Trains, E-Locos Head To Malaysia For Testing

ECRL First EMU Trains, E-Locos Head To Malaysia For Testing

Malaysia’s East Coast Rail Link gears up as its first EMUs and electric locomotives arrive for testing and future service.

17-12-2025
Auto News
First ECRL Trains Depart China, Remaining Units Arriving Through 2026

First ECRL Trains Depart China, Remaining Units Arriving Through 2026

First ECRL trains depart China, with remaining units scheduled to arrive through 2026.

28-11-2025
Auto News
ECRL Nears Completion with 89% Progress, Operations Set for 2027

ECRL Nears Completion with 89% Progress, Operations Set for 2027

ECRL is on track to begin services from Kota Bharu to Gombak in Jan 2027, as construction progress hits 89%.

Latest News

Auto News
XPENG Malaysia After Bermaz: Warranty, Servicing And Ownership Guide

XPENG Malaysia After Bermaz: Warranty, Servicing And Ownership Guide

Own an XPENG in Malaysia? Find out what happens to your warranty, free maintenance, service centres and existing bookings after Bermaz's exit.

27-11-2026
Auto News
Malaysia Car Sales Forecast 2026: CIMB Sees 815,000 Units

Malaysia Car Sales Forecast 2026: CIMB Sees 815,000 Units

Malaysia car sales could reach 815,000 units in 2026, says CIMB. But aggressive discounts may squeeze automakers' profit margins.

26-11-2026
Auto News
Proton Persona Ends 19-Year Production Run, Final Car Delivered

Proton Persona Ends 19-Year Production Run, Final Car Delivered

Proton delivers the final Persona after 19 years and 473,346 sales. Explore its history, final handover and the S70 replacing it in Malaysia.

25-11-2026
Auto News
JETOUR T2 Appears In Takluk 2: Op Daulat Movie

JETOUR T2 Appears In Takluk 2: Op Daulat Movie

JETOUR T2 appears in Takluk 2: Op Daulat, opening 26 November. Here's what Carz spotted at the premiere and how JETOUR is involved.

25-11-2026
Auto News
Federal Highway Jams: Govt Reviews New Toll Highway Proposals

Federal Highway Jams: Govt Reviews New Toll Highway Proposals

The govt is reviewing new toll highway proposals to ease Federal Highway jams. Here's why widening isn't planned and what motorists should know.

25-11-2026
Auto News
JPJ Requires Updated Address, Email And Phone Number Details

JPJ Requires Updated Address, Email And Phone Number Details

JPJ requires updated address, email and phone details. Here's what Malaysians need to check, how to update their information and what JPJ says about deadlines.

24-11-2026
Auto News
Penang ANPR: 27,734 Parking Fines Cancelled, Future Plans Explained

Penang ANPR: 27,734 Parking Fines Cancelled, Future Plans Explained

Penang has no plans to resume ANPR parking enforcement after cancelling 27,734 fines and refunding RM203,170. Here's what drivers should know.

23-11-2026
Auto News
Yangwang U9 And U8 To Be Displayed In Malaysia At MATRADE, Nov 27–29

Yangwang U9 And U8 To Be Displayed In Malaysia At MATRADE, Nov 27–29

The Yangwang U9 and U8 are coming to Malaysia for a special showcase at MATRADE from Nov 27–29. Here's where to see them and what makes them special.

23-11-2026

Show More

trending_flat

Malaysia First Used Car and EV Consignment Platform

This is the best place to sell your car at true market value. Instead of accepting low dealer trade-ins, we handle everything and connect your car directly to genuine buyers for the highest price.

I want to consign my car! Trade-in price too low.

CariCarz Automall

Understanding CariCarzAutomall Consignment Plan

Approved 200-Check Points Inspection

7 Day Money Back Guarantee

One Year Extended Warranty

No Hidden Charge

Carz Automedia Malaysia Logo
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2026 CariCarz.com. All Rights Reserved.